Daily work logs for construction sites: how to make them up to the highest standards? Consider these 5 aspects: exactness, communication, strategy, control, and differentiation between activities.
Daily work logs for construction sites
Download the Mela app
Reading makes a full man, conversation a ready man, and writing an EXACT man.
(Francis Bacon)
When it comes to your logs, details are the name of the game: the more exact details you register, the more you will be able to review the work that was done. For example, the phrase "Stump removal works" lacks a few essential details. What machinery was used to do this? Was the perimeter secured during this operation? Was it necessary to remove the surrounding asphalt? Was anything added to replace it? What happened to the wood that was removed?
The accuracy and details found in the construction site's work logs can also help you spot any future problems that may stem later on from misunderstandings or a lack of information from the client. This can all be predicted before it gets complicated or it sours the relationship with the client.
The failure of a relationship is almost always a failure of COMMUNICATION.
(Zygmunt Bauman)
A cornerstone for a successful project is communicating with all the participants in a project, and knowing how to do it at the right time and in the right way. Therefore, when compiling your work logs, it is fundamental to interact constantly with your work squad, the builder, and the Project director. For example, you will need to ensure that you inform the client - while the works are still ongoing, and not after you have finished them! - if a specific activity will take longer than expected. This will prevent any misunderstanding, or even worse, complaints.
Remember: if your relationship with the client sours, and you end up in litigation, one of the main sources of information that the technical consultants will examine are your daily time and material logs.
Success is 20% skills and 80% STRATEGY
(Jim Rohn)
A good strategy is a project's foundation. In our case, a strategy will be key to ensure everything is done in the best possible way, without any hiccups or delays, AND without any misunderstanding or errors that could Compromise productivity. To this end, your daily work logs should include the technical documentation demanded by law, or the Certificate of Conformity once works are completed.
Nothing should be left to chance: the daily time and metarials logs (and the daily construction report) should include both documents and information from the site. These, alongside every single event, need to be traceable within a unified virtual platform before, during, and after construction or remodelling works.
Everyone has expectations. You just don't want to have them dashed, so you're quiet about them.
(Josh Radnor)
Stay in control of things, and register every single event that happens on-site every day on the daily construction logs, even from far away. Did new construction materials arrive on-site? Take a picture of the shipping documents or the invoice (or if you are not on-site, ask one of your colleagues to do it for you.) In this way, you will be immediately able to track the materials that just arrived, and at the same time, inform your accounting team.
Also, always remember to include: the number of hours worked by your employees or collaborators, materials used, the equipment that arrived on-site, alongside possible third-party services (scaffolding, excavations, cranes...) and tools.
You don't own what you don’t DIFFERENTIATE
(Johann Wolfgang Goethe)
An important tactic to avoid creating confusion is to always keep each construction site separate. While performing the day to day activities on each site, remember to always request separate invoices and shipping manifestos for each site, even if they are collected in person, or if they are delivered to the company's centralized warehouse.